logo
  • logo
  • hello@craik.co
A9/A85 upgrade

CRAIK provided project management and senior engineering supervision on the £35 million contract for the new junction between the A9 and A85 and the link road to Bertha Park. The scheme involved a new grade-separated interchange, a bridge over the River Almond, 2 bridges over the A9, 500,000 m³ of embankments, multi-modal pedestrian/cycle infrastructure, and several watercourse diversions. The project was procured under an NEC3 Engineering and Construction Contract and won the 2019 NEC “Contract of the Year” Award for its collaborative delivery and successful early completion. CRAIK provided technical oversight and coordination between client, contractor and designers, managed risk and constructability reviews, and helped maintain alignment between contract scope, design intent and site execution.

  • Previous Troll A
  • Next Steel Structures
Back to all

hello@craik.co

© 2026 Craik Co. All rights reserved


hello@craik.co

© 2026 Craik Co. All rights reserved

© 2026 Craik Co. All rights reserved

Privacy Preference Center

Privacy Preferences