hello@craik.co
Troll A
CRAIK
delivered
a
range
of
engineering
designs
to
support
construction
and
installation
activities
for
the
Troll
A
expansion
project,
which
involved
integrating
large
new
topside
modules
onto
one
of
the
world’s
most
iconic
offshore
structures.
This
included
developing
the
temporary
works
and
spatial
planning
required
to
handle
modules
weighing
up
to
4,500
tonnes
each,
ensuring
safe
and
efficient
transfer
from
fabrication
yard
to
offshore
installation.
Key
deliverables
included
the
design
of
lifting
points,
guide
and
bumper
frames,
and
both
primary
and
secondary
rigging
systems.
These
designs
helped
coordinate
heavy-lift
operations,
de-risk
alignment
tolerances,
and
support
the
overall
construction
and
integration
strategy
for
the
project.
Previous
Thames Tideway
Next
A9/A85 upgrade
Back to all
hello@craik.co
© 2026 Craik Co.
All rights reserved
Privacy Preference Center
Privacy Preferences